Height down, waiting for start of construction

After our first site manager could not make a comparable offer for the excavation work, we have again the phone and negotiated an offer that was for us on the very edge of reasonable force. In retrospect, then again in 1200 came to € because the statics are adjusted for the existing building must again. We are so far gone that our scheduled now for money on the carport floor exchange and structural analysis will be invested ... an expensive pad, on which the house stands.

mid-February we met with site managers, surveyors, civil engineers and fabric workers on site to set the house height. The weather was expandable (zero temperatures, wind), but given the fact that Now it should start soon, were all pretty good mood. Our house is (reference point of finished floor) is now about 40cm higher than the nearby street.

provide by us will be left of the site power, which I had last week asked several times when the electrician who makes us in the household. Result: No Baustromkästen gone, should I look for someone local. No sooner said than done - a local electrician has applied immediately for us, and presumably from the 3.3. there is now current on the site. So now we're waiting for weather improvement, and then it should start immediately, according to site manager.

addition to the level setting was interesting, however, that 100 Meters already have other Fischer-building topping-out ceremony celebrated builders. These were - because we are building in the same part of the building area - probably their building permit at the same time as we get only the things seemed much more quickly, despite the winter weather had worked out to be ... because we will stop by on occasion times. We hope at least not to be treated as "Fischer-building owners second-class".

0 comments:

Post a Comment